Hardware Assembly
Draft outline
Scaffold. Replace the bullet prompts with your own text and delete this banner when done.
Planning decisions to make before a FRAME arrives or is redeployed.
Bench and environment
- Space (300 x 300 x 300 mm plus clearance), flat/stable surface, vibration, light control.
- Temperature/humidity limits for live-cell or long time-lapse work.
Power planning
- Region/voltage (110/230 V); the included Meanwell supply; optional 12 V battery.
TODO
Notion source: TASK-FR028 Organize correct power supply for FRAME.
Choose your configuration
- Which objectives (4x/10x/20x/60x), camera (mono/colour), illumination (LED matrix, which lasers), sample-holder type (slides / well plates / dishes).
- Cross-link: Reference / specifications.